Monday 23 December 2019

218 - Railway Project - Part 8

Hi, it's time for part 8 and I think it's about time my brother-in-law and I came up with a name for the layout, I can't keep calling it "The Layout".

If you're interested, the previous posts can be found here:

Having rescued the layout on the last post, we could finally start cracking on with the landscaping.

Filler mixed with green paint first to give a good base colour, cover up joins and add some ground texture.

Quite a large section to cover and blend into the base board.

The base colour becomes a bit more "earthy" as you come round to the main station area. We tried to keep this smoother with the buildings being on here.

More green filler was applied in the far corner and along the top edge of this section.

The nice smooth filler continued down the ramp that we added in as a transition point.

And the green continued in the top corner here as well.

We are planning on creating a road that will run from the main station, down the ramp to the inner loop station and beyond, so this area received some dark grey filler to create a more industrial base.

And the road will also continue through the viaduct.

Finally we used the earthy filler to block out nay spaces that hadn't been touched, such as the large blank space on the opposite side of the inner loop.

Thanks for reading through and again wishing you all a Merry Christmas and Happy New Year.

0 comments:

Copyright © 2012 Cadian 127th Regiment All Right Reserved